Some examples of our COMMERCIAL DRYING SUCCESS using cutting edge drying
technology.
Major Hotel Stansted Airport. Entire entire ground floor flood. Speed
drying technology dried, partition walls and saturated carpets with underlay
within 2 days allowing for continued trading and refurbishment as agreed with
Insurers as a planned maintenance project. This allowed the Hotel to keep trading
with the minimum of downtime.
Meadowhall Shopping Centre Sheffield.
When a number of retails stores flooded after a severe storm, downtime of the
stores needed to be kept to a minimum. Due to the size of each store and power
limitations, it was decided by the Loss Assessor and Retailers that our trailer
drying systems be deployed as part of the recovery program - thereby reducing
delays that could have been expected had traditional methods been used.
Hotel Grosvenor Sq London: Flood to Exhibition Hall the night before the
start of a major exhibition. Speed Drying technology dried the saturated
stands, wilton carpets with felt underlay and removed odour overnight allowing
the exhibition to continue as planned.
Offices Bristol, major flood on
a Friday evening causing disruption to VAT department handing £3,500,000
in transactions every day including weekends. Speed Drying technology deployed
that same evening of call out ensured rapid drying of the building enabling almost
continuous trading.
Well
known Wall covering manufacturer, St Albans, Major flood to ground floor offices,
canteen and workshop. Speed drying technology ensured rapid return to much of
the affected areas within days without rip out of partition walls which were
saved. Significant time and refurbishment costs were saved as a result of our
actions.
Offices Gloucester. Following storms,
the river flood throughout the ground floor of these offices causing the Café to
close and disruption through out. Contract cleaners called us in to reduce the
impace. We had the cafe trading within 23 hours and the main reception the same
day. The rest of the floor was dried to pre incident conditions within days.
Loss of business was minimal.
Nursery Telford, Flooded throughout the building. Speed drying
technology ensured no structural strip out allowing for a return to business
in 12 days as opposed to several months had conventional dehumidifiers been used.
School, Northampton, Major flood to the music Block. Seriously flooded previously
to a similar degree, the was out of use for nearly six months. When it flood
again, by using our Speed Dry technology, the recovery took just two months and
saved on the substantial cost of stripping plaster /skirtings which were left
en situ.
University,
London, Flooding to library and three floors below. Speed drying technology was
deployed following this major flood allowing for normal use of the building within
one week.
Historic Book Museum, London Euston, major flood. This library
had to be kept at very specific environmental conditions. The flooding significantly
elevated environmental relative humidity, potentially increasing the risk from
mould proliferation risking historic books and documents. Our system quickly
reduced and maintained the RH to acceptable levels.
Document Archive
Store Bristol. Major flood throughout basement storage. Severe flooding over
a substantial area caused hundreds of filled archive boxes to topple into the
water. After excess water was pumped away, Speed drying technology was used,
drying the boxes and paperwork within 48hrs and making the work of our document
Recovery partners a whole lot easier.
Engineering Company Cambridge.
Major flood with potential to cause secondary damage to £10m worth of industrial
machinery saved from rusting Saved by the use of Speed drying technology.
Printers
North London. Entire ground floor flooded with £5m worth of printing machines
at serious risk of corrosion. Speed Drying technology was used to control the
Relative humidity and dry the offices allowing return to business in three days.
Public House / Restaurant. Major river flood through ground floor comprising
some 5000 sq ft. With £10000 per week loss of profits. A fast solution
was required. Speed drying technology was used and within two weeks the business
was up and running. Refurbishments agreed with Insurers were put in hand as a
planned refurb schedule. The business owner later reported a notable increase
in turnover as his nearby competitors, also flooded in the same event using traditional
dehumidifier and strip out methods, were left out of business for up to ONE YEAR!
Steelworks, Sheffield. Major river flood throughout the works affecting heavy
industry machinery. Speed drying technology deployed
to dry machinery fast and prevent rusting. This allowed engineers to check out
and re commission the machinery, saving £millions
in downtime and replacement costs.
Football club: Guernsey. Following
a major flood to the entire club a year previously, the building had been refurbed
at significant cost and had been out of business, almost as long. Following failure
of the flooring, it was found that the subfloor was still saturated and that
pipe work buried in the floor was leaking. Our Speed dry technology was used
to reduce the impact and cut downtime. Within 16 days the floor was certified
dry and new floorcoverings /redecoration were undertaken in a short period to
allow a return to normal trading.