Some examples of our success with floods in the CONSTRUCTION industry.
New Build Hotel, Westminster: Flooded over five floors just weeks before
handover. Speed Drying technology allowed our client to keep on track and remove
the potential of substantial penalty clauses.
New Build Apartment Block, Southampton.
78 apartments, many of which had been sold, flooded due to defective roofing.
All apartments were damaged and the builder had been unable to dry out the block
using conventional methods due to power & noise constraints. Three Speed
drying systems were used to dry the block within 12 days, with minimal rip out
of the dry lining. Our actions allowed purchasers to move in on their planned
dates significantly reducing claim potential against the Construction Company.
Football club: Guernsey. Following a major flood to the
entire club a year previously, the building was dried over many months out using
traditional methods. It was then refurbed at significant cost. Business interruption
costs had escalated. Following failure of the resilient flooring, it was found
that the subfloor was still saturated and that pipe work buried in the floor
was leaking. Insurers and the Football club, did not want to go through the year
long exercise again so soon after completion. Speed Dry
technology was used to reduce the impact and cut downtime. Within 16 days the
floor was certified dry and new floorcoverings /redecoration were undertaken
in a short period to allow a return to normal trading. Estimated cost saving
in the region of £70,000.
Hospital Extension, Gloucester.
The subfloor was flooded just days before the new resilient flooring was to be
laid. Delays would result in significant penalties. Speed drying technology was
deployed, drying the subfloor to the required 75% ERh in 4 days keeping the project
on track..
Apartment Block, Sheffield. A block of twelve apartments nearing completion
were saturated after a tap was left running over the weekend in one of the top
floor apartments. It was proposed that the dry lining be removed and replaced
after a conventional drying program had been undertaken and which was expected
to take up to four weeks. However, when it was realised that only 64 amps was
available, the basic drying program that had been proposed was. A faster less
power hungry solution was required. Speed drying technology was deployed and
within 7 days the building was certified dry keeping the project on track.
High
Value apartments: Bowden, Manchester. New build apartments due to be occupied
by their new owners which included several Manchester United football players
were flooded due to pipework defects. The main damage in each apartment was to
the lower dry lined walls and the sub floor insulation over which was laid a
hydronic underfloor heating system and 75mm gyvlon screed. The Insulation was
saturated. Action Dry were called in. Compressor extraction with water separators
were used to extract loose water from beneath the screed and then Speed drying
techniques were added to create an optimised rapid drying environment. Works
in each apartment were completed in around 10 days with NO rip out and minimal
redecoration. Our Actions minimised costs to the MC and ensured that the new
occupiers could move in on the planned dates. Significant cost saving was attributed
to our actions.
Office Build Worcester. Newly built office building
flooded throughout ground floor when the nearby river burst its banks. The floor
was occupied by three separate Companies who were all asked to use the Insurers
preferred damage mitigation contractor. All proposed different levels of drying
equipment, all agreed the building’s occupiers would have to be relocated,
that stripping out was vital and that the building was likely to be out of use
for around six months. Our client, one of the occupiers, who uses our services
on a National basis, claimed their right to use their own preferred supplier
- Action Dry. The Speedry trailer system was deployed by Action Dry. NO stripout
was undertaken other than removal of vinyl wallpaper and carpet tiles. Our Clients
offices were cleaned and dried within 8 days. Following drying, a planned refurbishment
was undertaken allowing the occupants to move in with the minimum of delay. The
other occupants had not even finished their drying program by the time our client
was back in! IMAGINE THE COST SAVINGS!!!
Army Barracks Wiltshire. To keep on
track, the concrete sublfoor needed to have its moisture content reduced so that
the vinyl finish could be fitted. Time was running short and freezing conditions
did not help. Forced drying was required with drying targets achieved over a
weekend.